Facility profile California

Greenacre Homes

Open Sebastopol, California

Greenacre Homes is a program in Sebastopol, California.

Nonprofit tax filings

The yearly returns (IRS Form 990) of the nonprofit this program operates under, from the IRS through ProPublica's Nonprofit Explorer.

Greenacre Homes Inc

EIN 94-2559262, Sebastopol, CA. Filed with the IRS as human services, tax-exempt since 1992. Every filing on ProPublica's Nonprofit Explorer

YearRevenueExpensesPaid to officers and directorsAssets at year endReturn
2025 Form 990
2024 Form 990
2023 $5,351,798 $5,556,072 $192,225 $2,748,283 Form 990
2022 $5,522,983 $5,176,598 $270,490 $2,880,953 Form 990
2021 $5,696,866 $5,254,074 $255,259 $2,560,312 Form 990
2020 $5,291,542 $5,289,235 $221,930 $2,132,826 Form 990
2019 $5,044,740 $5,083,945 $729,208 $1,499,351 Form 990
2018 $5,323,548 $5,109,645 $594,359 $1,547,188 Form 990
2017 $4,876,012 $4,782,160 $463,209 $1,323,021 Form 990
2016 $4,945,395 $4,470,139 $491,948 $1,270,374 Form 990
Earlier years (15)

Licensing and inspections

Licensed as
GREENACRE HOMES, INC. (OCCIDENTAL); GREENACRE HOMES, INC. NO 1 (JOYCE DRIVE); GREENACRE HOMES, INC. NO 4 (EDDIE LANE)
License category
Short Term Residential Therapeutic Program (STRTP)
Executive director
ROBIN HAUSSERMAN
Licensed capacity
6

40 inspection reports on file. Search all California reports

The newest 25 reports, by date: 9 findings in 9 reports
  1. Mar 18, 2025 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 03/18/25 at 10: AM, Licensing Program Analyst (LPA) Jasmine Cardeno and LPA Celeste Aparicio conducted an unannounced visit to the facility listed above. The purpose of the visit is to conduct the required SB Psychotropic Medications inspection. LPAs met with Deputy Director, Timothy Dimick, and Direct Care Staff, Isaiah Wisdom, who both facilitated the inspection. At the time of the inspection, two clients in care were present. The facility had one client that met the criteria for the SB Psychotropic Medication Inspection. LPAs reviewed 1 of child's records and 6 of staff personnel files on site at the facility. LPAs reviewed 1 of child's psychotropic medications and medication records. LPAs interviewed 3 of staff on site to discuss the facilities policies and procedures of operation. LPAs interviewed 1 of the children currently prescribed psychotropic medication. No deficiencies are being observed or cited at this time. The SB Psychotropic Medications inspection is complete. LPAs conducted an exit interview with Deputy Director and a copy of this report was left with Deputy Director, Timothy Dimick, whose signature on this form confirms receipt.

  2. Mar 18, 2025 Complaint Investigation - Unsubstantiated - 3 allegations
  3. Mar 18, 2025 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 03/18/25 at 10: AM, Licensing Program Analyst (LPA) Jasmine Cardeno and LPA Celeste Aparicio conducted an unannounced visit to the facility listed above. The purpose of the visit is to conduct the required SB Psychotropic Medications inspection. LPAs met with Deputy Director, Timothy Dimick, and Direct Care Staff, Isaiah Wisdom, who both facilitated the inspection. At the time of the inspection, two clients in care were present. The facility had one client that met the criteria for the SB Psychotropic Medication Inspection. LPAs reviewed 1 of child's records and 6 of staff personnel files on site at the facility. LPAs reviewed 1 of child's psychotropic medications and medication records. LPAs interviewed 3 of staff on site to discuss the facilities policies and procedures of operation. LPAs interviewed 1 of the children currently prescribed psychotropic medication. No deficiencies are being observed or cited at this time. The SB Psychotropic Medications inspection is complete. LPAs conducted an exit interview with Deputy Director and a copy of this report was left with Deputy Director, Timothy Dimick, whose signature on this form confirms receipt.

  4. Mar 18, 2025 Complaint Investigation - Unsubstantiated - 3 allegations
  5. Dec 2, 2024 Facility Evaluation
  6. Dec 2, 2024 Facility Evaluation
  7. Mar 14, 2024 Facility Evaluation
  8. Mar 14, 2024 Facility Evaluation
  9. Mar 7, 2024 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      An unannounced SB Psychotropic Medication Inspection was conducted by Licensing Program Analyst (LPA) Cheyenne McCambridge on 03/07/2024 at 10: AM. During the inspection, LPA McCambridge met with human resources Shonna Kuhner in the main office. LPA reviewed zero of child's records on site at the facility at due to client not being on Psychotropic Medication. LPA reviewed zero of child's psychotropic medications and medication records. LPA interviewed zero of children currently taking psychotropic medication. LPA interviewed three of staff on site starting at 10: AM. LPA reviewed three of staff personnel files on site at the facility starting at 12: PM. Brook Leone, Facility Manager escorted LPA on a tour of the facility inside and out at 1: PM No deficiencies are being cited at this time. LPA conducted exit interview with Shonna Kuhner and a copy of the report was sent to the facility.

  10. Mar 7, 2024 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      An unannounced SB Psychotropic Medication Inspection was conducted by Licensing Program Analyst (LPA) Cheyenne McCambridge on 03/07/2024 at 10: AM. During the inspection, LPA McCambridge met with human resources Shonna Kuhner in the main office. LPA reviewed zero of child's records on site at the facility at due to client not being on Psychotropic Medication. LPA reviewed zero of child's psychotropic medications and medication records. LPA interviewed zero of children currently taking psychotropic medication. LPA interviewed three of staff on site starting at 10: AM. LPA reviewed three of staff personnel files on site at the facility starting at 12: PM. Brook Leone, Facility Manager escorted LPA on a tour of the facility inside and out at 1: PM No deficiencies are being cited at this time. LPA conducted exit interview with Shonna Kuhner and a copy of the report was sent to the facility.

  11. Jan 11, 2024 Complaint Investigation - Unsubstantiated
  12. Jan 11, 2024 Complaint Investigation - Unsubstantiated
  13. Jun 6, 2023 Facility Evaluation
  14. Jun 6, 2023 Facility Evaluation
  15. Jan 26, 2023 Facility Evaluation
  16. Jan 26, 2023 Facility Evaluation
  17. Jan 10, 2023 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On the above date, Licensing Program Analyst (LPA) Brian Bertoli met with Clinical Director Robin Hausserman at the facility for the purpose of completing an Annual/Required Inspection. Prior to the inspection a COVID pre-screening call was made, and there were no current cases, known exposures, or symptomatic persons at the facility. The facility is currently inactive and has no placements or staff. Greenacre Homes is in the process of hiring staff and will accept placements as soon as they meet the staffing requirements. Due to their inactive status, only the inspection of the facility and the Physical Plant section were completed (per LPM Isabel Mendoza). No Title 22 deficiencies were observed. An exit interview was completed and a copy of this report was left with the facility. Due to technical difficulties, the original signed copy of this report was deleted in error and a second copy was sent for signature.

  18. Jan 10, 2023 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On the above date, Licensing Program Analyst (LPA) Brian Bertoli met with Clinical Director Robin Hausserman at the facility for the purpose of completing an Annual/Required Inspection. Prior to the inspection a COVID pre-screening call was made, and there were no current cases, known exposures, or symptomatic persons at the facility. The facility is currently inactive and has no placements or staff. Greenacre Homes is in the process of hiring staff and will accept placements as soon as they meet the staffing requirements. Due to their inactive status, only the inspection of the facility and the Physical Plant section were completed (per LPM Isabel Mendoza). No Title 22 deficiencies were observed. An exit interview was completed and a copy of this report was left with the facility. Due to technical difficulties, the original signed copy of this report was deleted in error and a second copy was sent for signature.

  19. Jul 7, 2022 Facility Evaluation
  20. Jul 7, 2022 Facility Evaluation
  21. Jun 30, 2022 Facility Evaluation
  22. Jun 30, 2022 Facility Evaluation
  23. Jun 21, 2022 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On the above date, Licensing Program Analysts (LPA) David Hiett and George Karkazis made an unannounced visit to initiate a required annual inspection. LPA met with Deputy Director Time Dimick. 5 staff files and 3 client files were reviewed and found to be complete. All files were found to be complete and compliant with relevant regulations. Interviews and physical plant inspection will be completed on a subsequent visit. No deficiencies were cited and a copy of this report was with the facility. On June 23, 2022, Licensing Program Analyst (LPA) David Hiett continued an annual inspection for Greenacre Homes STRTP - Eddie Lane. LPA met with Facility Manager Brook Leone and inspected the facility inside and out. The STRTP is licensed to serve 9 ambulatory male clients, ages 6-17. An inspection of the facility was conducted, and the following was observed: Hot water temperature measures 109 degrees Fahrenheit. Individual beds were observed with appropriate clean linens and are in good repair. Centrally stored medications are maintained in a locked cabinet. Toxic chemicals are locked in a cabinet located and secured in the laundry room. LPA observed all required documentation posted in the facility, to include: Facility license, Emergency Disaster Plan, LIC 610 and evacuation plan, Menu, Weekly Activity Schedule, Client's Rights, OSHA signs. A physical plant inspection was completed and included the following checks. Facility grounds are clean and free of debris and observable ...

  24. Jun 21, 2022 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On the above date, Licensing Program Analysts (LPA) David Hiett and George Karkazis made an unannounced visit to initiate a required annual inspection. LPA met with Deputy Director Time Dimick. 5 staff files and 3 client files were reviewed and found to be complete. All files were found to be complete and compliant with relevant regulations. Interviews and physical plant inspection will be completed on a subsequent visit. No deficiencies were cited and a copy of this report was with the facility. On June 23, 2022, Licensing Program Analyst (LPA) David Hiett continued an annual inspection for Greenacre Homes STRTP - Eddie Lane. LPA met with Facility Manager Brook Leone and inspected the facility inside and out. The STRTP is licensed to serve 9 ambulatory male clients, ages 6-17. An inspection of the facility was conducted, and the following was observed: Hot water temperature measures 109 degrees Fahrenheit. Individual beds were observed with appropriate clean linens and are in good repair. Centrally stored medications are maintained in a locked cabinet. Toxic chemicals are locked in a cabinet located and secured in the laundry room. LPA observed all required documentation posted in the facility, to include: Facility license, Emergency Disaster Plan, LIC 610 and evacuation plan, Menu, Weekly Activity Schedule, Client's Rights, OSHA signs. A physical plant inspection was completed and included the following checks. Facility grounds are clean and free of debris and observable ...

  25. Jun 20, 2022 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On the above date, Licensing Program Analyst (LPA) David Hiett made an unannounced visit to initiate a required annual inspection. LPA met with Clinical Director Robin Hausserman at the main program office at the Eddie Lane facility. 5 staff files and 3 client files were reviewed and found to be complete. Interviews and physical plant inspection will be completed on a subsequent visit. No deficiencies were cited and a copy of this report was with the facility.

Record updated . Generated from the Kids Over Profits facility database. Suggest a correction