Haven of Hope is a program in California.

Homes

The state licenses this program home by home: 2 on record, 2 open. Each has its own page with its licence and reports; their news, lawsuits and serious findings are gathered here too.

  • Abeona House Haven of Hope – Abeona House | Aptos, California | Open
  • Halcyon House Haven of Hope – Halcyon House | Watsonville, California | Open

Licensing and inspections

Licensed as
HAVEN OF HOPE, INC.
License category
Type 726
Executive director
DAVINA POLANCO
Licensed capacity
15

18 inspection reports on file. Search all California reports

Every report, by date: 5 findings in 5 reports
  1. May 6, 2026 Facility Evaluation
  2. Apr 30, 2026 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 4/30/26 at 9: AM, Licensing Program Analysts (LPA) Paul Simien conducted an unannounced visit to the above listed facility. The purpose of this visit was to conduct the required annual inspection. LPA met with Libby Matulich, Program Manager (PM), at the above facility to conduct the required annual inspection. LPA reviewed five client files. LPA completed Operational Requirements, Disaster Preparedness, Emergency Intervention Plan and Client Records sections of the CARE Tools. At this time the inspection is not complete, LPA will return to complete the inspection. No deficiencies were cited at this time. LPA conducted an exit interview with PM.

  3. Jul 9, 2025 Complaint Investigation - Unsubstantiated - 1 allegation
  4. Jul 9, 2025 Complaint Investigation - Unsubstantiated - 1 allegation
  5. May 1, 2025 Facility Evaluation
  6. May 1, 2025 Facility Evaluation
  7. Apr 30, 2025 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 4/30/25 at 10: AM, Licensing Program Analysts (LPA) Paul Simien conducted an unannounced visit to the above listed facility. The purpose of this visit was to conduct the required annual inspection. LPA met with Libby Matulich, Program Manager (PM), at the above facility to conduct the required annual inspection. LPAs reviewed five client files and four staff files At this time the inspection is not complete, LPA will return to complete the inspection. No deficiencies were cited at this time. LPA conducted an exit interview with PM.

  8. Apr 30, 2025 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 4/30/25 at 10: AM, Licensing Program Analysts (LPA) Paul Simien conducted an unannounced visit to the above listed facility. The purpose of this visit was to conduct the required annual inspection. LPA met with Libby Matulich, Program Manager (PM), at the above facility to conduct the required annual inspection. LPAs reviewed five client files and four staff files At this time the inspection is not complete, LPA will return to complete the inspection. No deficiencies were cited at this time. LPA conducted an exit interview with PM.

  9. Oct 9, 2024 Complaint Investigation - Unsubstantiated - 3 allegations
  10. Oct 9, 2024 Complaint Investigation - Unsubstantiated - 3 allegations
  11. Jun 5, 2024 Facility Evaluation
  12. Jun 5, 2024 Facility Evaluation
  13. May 5, 2022 Facility Evaluation
  14. May 5, 2022 Facility Evaluation
  15. Apr 25, 2022 Facility Evaluation
  16. Apr 25, 2022 Facility Evaluation
  17. Apr 22, 2022 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 04/22/2022 at 11:00AM, Licensing Program Analyst (LPA) Selena Hood and Licensing Program Analyst (LPA) Lisette Valenzuela conducted an unannounced visit to the above facility. The purpose of this visit was to conduct the required annual visit. LPA Selena Hood and LPA Lisette Valenzuela met with April Pao, Program Manager, at the main office. LPA Hood and LPA Valenzuela reviewed three client files, ten staff files, and interviewed one staff member. LPAs also conducted a physical plant inspection. No Type A or Type B deficiencies were cited. LPAs cited three Technical Violations for: Interim Licensing Standard Version 86268.3(a), ILS 86268.3(d), and ILS 86068.3(b) (see LIC9102s). LPAs conducted an exit interview with April Pao, Program Manager, at 2:40PM. LPAs discussed and delivered appeal rights.

  18. Apr 22, 2022 Facility Evaluation
    1 finding
    • Deficiency cited at inspection

      On 04/22/2022 at 11:00AM, Licensing Program Analyst (LPA) Selena Hood and Licensing Program Analyst (LPA) Lisette Valenzuela conducted an unannounced visit to the above facility. The purpose of this visit was to conduct the required annual visit. LPA Selena Hood and LPA Lisette Valenzuela met with April Pao, Program Manager, at the main office. LPA Hood and LPA Valenzuela reviewed three client files, ten staff files, and interviewed one staff member. LPAs also conducted a physical plant inspection. No Type A or Type B deficiencies were cited. LPAs cited three Technical Violations for: Interim Licensing Standard Version 86268.3(a), ILS 86268.3(d), and ILS 86068.3(b) (see LIC9102s). LPAs conducted an exit interview with April Pao, Program Manager, at 2:40PM. LPAs discussed and delivered appeal rights.