Facility profile West Virginia
River Park Hospital – The Roundtable Program
One of 3 homes of River Park Hospital
River Park Hospital – The Roundtable Program is a program in Huntington, West Virginia, operated by Universal Health Services (UHS).
Other homes of River Park Hospital
The whole program, with every home’s news, lawsuits and serious findings
Licensing and inspections
- Licensed as
- River Park Hospital (Roundtable)
- Program
- WV-21056
- License category
- Psychiatric residential treatment facility
- Licensed capacity
- 21
- Licensing action
- Active
- Phone on file
- (304) 526-9111
- Licensed address
- 1230 Sixth Avenue, Huntington, WV 25719
7 inspection reports on file. Search all West Virginia reports
Every report, by date: 24 findings in 1 report
- Feb 28, 2024 Recertification Survey: no deficiencies cited Open report
- Sep 7, 2022 Complaint Survey: no deficiencies cited Open report
- Aug 23, 2021 Recertification, Follow-up/Revisit Survey: no deficiencies cited Open report
-
Jul 15, 2021
Recertification Survey: 24 deficiencies cited
Open report
24 findings
-
Deficiency cited, recertification survey : E 001 Establishment of the Emergency Program (EP)
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to have an Emergency Preparedness Plan (EPP) which was specific to the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency.
-
Deficiency cited, recertification survey : E 004 Develop EP Plan, Review and Update Annually
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an Emergency Preparedness Plan (EPP) which was specific to the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility EPP revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 006 Plan Based on All Hazards Risk Assessment
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an Emergency Preparedness Plan (EPP) that was based on and included a facility- based and community-based risk assessment utilizing an all-hazards approach specific to the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility EPP revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 007 EP Program Patient Population
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an Emergency Preparedness Plan (EPP) that addressed the patient/client population including persons at risk, the type of services the PRTF has the ability to provide in an emergency and continuity of operations including delegations of authority and succession plans. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility EPP revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 009 Local, State, Tribal Collaboration Process
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an Emergency Preparedness Plan (EPP) that included a process for cooperation and collaboration with local, State and Federal emergency preparedness officials' efforts to maintain an integrated response during a disaster or emergency situation. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility EPP revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 013 Development of EP Policies and Procedures
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 015 Subsistence Needs for Staff and Patients
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for the PRTF based on the emergency plan, the risk assessment and the communication plan. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 018 Procedures for Tracking of Staff and Patients
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for the tracking of patients and staff specific to the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 020 Policies for Evac. and Primary/Alt. Comm.
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for the safe evacuation from the PRTF including care and treatment needs of residents, staff responsibilities, transportation, identification of evacuation locations and primary and alternate means of communication. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 022 Policies/Procedures for Sheltering in Place
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for a means to shelter in place for residents, staff and volunteers who remain in the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 023 Policies/Procedures for Medical Documentation
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for a system of medical documentation which preserves patient information, protects confidentiality and secures and maintains availability of records for the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 024 Policies/Procedures-Volunteers and Staffing
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for the use of volunteers in an emergency for the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 025 Arrangement with Other Facilities
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures based on the emergency plan, risk assessment and communication plan. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 026 Roles Under a Waiver Declared by Secretary
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and implement emergency preparedness policies and procedures for the role of the PRTF under a waiver declared by the Secretary in the provision of care and treatment at an alternate care site identified by emergency officials. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 029 Development of Communication Plan
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws for the PRTF. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 030 Names and Contact Information
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness communication plan for the PRTF that contains names and contact information for staff, entities providing services under arrangement, resident physicians, other facilities and volunteers. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 031 Emergency Officials Contact Information
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness communication plan for the PRTF that contains names and contact information for Federal, State, tribal, regional and local emergency preparedness staff and other sources of assistance. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 032 Primary/Alternate Means for Communication
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness communication plan for the PRTF that included a primary and alternate means for communicating with PRTF staff, Federal, State tribal, regional and local management agencies. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 033 Methods for Sharing Information
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness communication plan for the PRTF that included a method for sharing information and medical documentation for residents under the PRTF's care as needed with other health care providers to maintain the continuity of care. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 034 Information on Occupancy/Needs
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness communication plan for the PRTF that included a means for providing information about the PRTF's occupancy, needs and its ability to provide assistance to the authority having jurisdiction, the Incident Command Center or designee. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 036 EP Training and Testing
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness training and testing program for the PRTF that is based on the emergency plan, risk assessment and communication plan. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 037 EP Training Program
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness training program for the PRTF that provided initial training in emergency preparedness policies and procedures to all new and existing staff provide emergency preparedness training every two (2) years, demonstrate staff knowledge and maintain documentation of the training. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 039 EP Testing Requirements
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to develop and maintain an emergency preparedness testing program for the PRTF that conducted testing exercises twice a year. This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility emergency preparedness plan (EPP) revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
Deficiency cited, recertification survey : E 042 Integrated EP Program
Based on document review and interview it was revealed the Roundtable Psychiatric Residential Treatment Facility (PRTF) failed to meet all requirements to unify and integrate with the hospital healthcare system Emergency Preparedness Plan (EPP). This failure has the potential to affect all residents residing in the PRTF in the event of an emergency. Findings include: 1. A document review of the facility EPP revealed the plan was entitled 'River Park Hospital Emergency Operations Plan' and was for the entire hospital with no specific entries for the Roundtable PRTF. 2. An interview was conducted with the Director of Plant Operations on 7/14/19 at approximately 1:10 p.m. He concurred there was not a separate EPP for the Roundtable PRTF.
-
- Aug 10, 2016 Recertification Survey: no deficiencies cited Open report
- Jan 18, 2012 Recertification Survey: no deficiencies cited Open report
- Jul 29, 2009 Recertification Survey: no deficiencies cited Open report
Documents
Research that mentions this program
We have questions about River Park Hospital – The Roundtable Program
If you were there, worked there or sent your child there, you can help fill in what our records are missing. Each question takes a moment; skip anything you do not know.
Answer questions about River Park Hospital – The Roundtable Program
